- Rong, Chaohe
- Title: Professor
- Tel:86-10-51687163
- E-mail: chrong@bjtu.edu.cn
- Department: Economics
Master:1983--1986-,Northern Jiaotong University
Ph.D.:1987--1991-,Northern Jiaotong University
Bachelor:1979--1993-,Northern Jiaotong University
1.2005-05-01,2005-08-01,Northwestern University, Chicago, USA,Visiting Scholar
2.1997-05-01,1997-08-01,Duquesne university,Visiting Scholar
3.1994-02-01,Economics Department, School of Economics and Management, Beijing Jiaotong University,Professor
4.1993-05-01,1994-02-01,Institute of Geography, Chinese Academy of Sciences,Research Associate
5.1991-04-01,1993-04-01,Institute of Geography, Chinese Academy of Sciences,Postdoctoral
Theory and Policy of Transportation Economy,Spatio-Temporal Economic Analysis
1. (CO-PI)A study on the spatio-temporal economy of traffic big data,National Social Science Foundation of China Post-Funded Project,CO-PI:Li, H.(2022-10-31 - 2022-10-31).
2. (CO-PI)Research on the future strategic direction of Beijing-Tianjin-Hebei transportation integration (1),Beijing High-End Think Tank Project,CO-PI:Xiao, X.(2019-07-11 - 2020-12-30).
3. (PI)Research on the innovative path and planning of developing Beijing regional express line by suburban railway (1),Beijing High-End Think Tank Project,PI:Rong, C.(2019-07-01 - 2020-12-30).
4. (PI)Study on the innovative path and planning of developing Beijing regional express line by suburban railway (1)-2,Beijing High-End Think Tank Project,PI:Rong, C.(2019-06-30 - 2020-06-30).
5. (CO-PI)Study on operation mode of container near inland port system in Shenzhen port,Other Departments,CO-PI:Li, H.(2018-05-08 - 2024-12-31).
6. (CO-PI)Research on pricing mechanism of high speed rail-three dimensional perspective of cost, social and economic benefits and passenger time value,China Railway,CO-PI:Ding, H.(2016-06-01 - 2017-12-31).
7. (CO-PI)A study on the administrative relationship and legal governance of the government of the airport economy in Beijing new airport,Other Departments,CO-PI:Li, J.(2016-03-29 - 2018-12-31).
8. (PI)Research on cooperative management of Beijing new airport economic zone,Other Departments,PI:Rong, C.(2016-03-29 - 2018-12-31).
9. (CO-PI)A study on the typical domestic and foreign management experience of Beijing new airport economic zone and its use for reference,Other Departments,CO-PI:Li, H.(2016-03-29 - 2018-12-31).
10. (CO-PI)Construction funds of Zhe She Base—Beijing traffic development research base in 2016,Beijing Municipal Education Commission,CO-PI:Lin, X.(2016-01-01 - 2016-12-31).
11. (CO-PI)Key points and methods of supervision of railway transport market,Other Departments,CO-PI:Wu, J.(2015-12-01 - 2019-12-31).
12. (CO-PI)Research on railway operation technology in western China—Study on the effect of Qinghai-Tibet Railway operation on economy and society,Science and Technology Foundation of the Ministry of Railways,CO-PI:Lin, X.(2015-03-01 - 2018-07-31).
13. (PI)Preliminary construction of economic time-space analysis method and related theoretical framework,Beijing Philosophy and Social Affairs Office,PI:Rong, C.(2015-01-26 - 2017-12-31).
14. (PI)Basic theories and methods of economic spatio-temporal analysis,Talent Fund,PI:Rong, C.(2015-01-01 - 2021-12-31).
15. (PI)Research on the time-space relationship of economy based on the time value of transportation or logistics,National Natural Science Foundation of China General Program,PI:Rong, C.(2012-01-01 - 2015-12-30).
1. (CO-PI)Development ideas and strategic research projects of Jinans rail transit industry,Social Science Commercially Funded Project,CO-PI:Li, H.(2020-05-15 - 2021-02-28).
2. (CO-PI)Study on competition and supervision of railway transportation market in China,Social Science Commercially Funded Project,CO-PI:Zhang, Q.(2017-03-01 - 2018-02-28).
3. (PI)Research on the top-level design of Beijing comprehensive transportation system,Social Science Commercially Funded Project,PI:Rong, C.(2015-06-02 - 2018-05-01).
4. (PI)Study on adaptability of comprehensive transportation system construction and economic society development in Jilin Province,Social Science Commercially Funded Project,PI:Rong, C.(2015-05-20 - 2017-06-30).
1.2015-07-01,First prize of railway Science and Technology Award of Railway Society
2.2015-01-01,First prize of railway Science and Technology Award of Railway Society
3.2015-01-01,The third prize of the 7th Outstanding Achievement Award of Scientific Research (Humanities and Social Sciences) in colleges and universities
Undergraduate
Research topics in industrial economics
Transportation economics
Special Topics on Time and Space Economy
Economics of transport
Special Topic on Space-time Economy
Postgraduate
Advanced Topics in Economics
Advanced Transportation Economics
Special Topics in Advanced Economics
Advanced Transport Economics
1. Rong, C.,(2018).Relationship between object letter and spatio-temporal economic analysis of internet sharing travel,Management World.
2. Rong, C.,(2017).Study on the enlightenment of railway container sea-rail intermodal transport in Alameda,Railway Transport and Economy.
3. Rong, C.,& Wang, D.(2017).Causesand liquidation process for huge debts of Japanese national railways,China Transportation Review.
4. Rong, C.,(2017).Patriotic dedication of traffic pioneers, cultural and educational celebrities-in memory of Ye Gongchuo, the old president of Jiaotong University,Journal of Beijing Jiaotong University (Social Sciences Edition).
5. Lan, H.,& Rong, C.(2017).Influence and enlightenment of Tokaido Shinkansen on city cluster industry and population distribution,Economic Geography.
6. Rong, C.,Han, S., Yan, S., & Wang, X.(2017).The concept of match and its time-spatial economic analytical framework,Journal of Beijing Jiaotong University (Social Sciences Edition).
7. Rong, C.,& Wang, D.(2017).Lessons from Taiwan High-speed Rail frequently trapped financial dilemma,Social Sciences in Guangdong.
8. Rong, C.,(2016).The adjustment to transportization stages division,Journal of Beijing Jiaotong University.
9. Rong, C.,(2016).The concepts of time and the framework of time-spatial analysis in economics,Journal of Beijing Jiaotong University (Social Sciences Edition).
10. Rong, C.,(2016).The role of Qinghai-Tibet Railway in the evolution of traffic spatio-temporal structure in Tibet,China Tibetology.
11. Zhang, G.,Luo, J., & Rong, C.(2016).Traffic rights legislation of relevant countries and its reference significance,China Transportation Review.
12. Rong, C.,& Wang, X.(2016).Identify the nature of online booked vehicle and promote regulatory reform of taxi industry,China Transportation Review.
13. Wang, B.,Rong, C., Li, H., & Wang, B.(2015).Multi-time point optimization model for empty railcar distribution,Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology.
1. Ou, G.,Bi, Y., Mao,B., Ye, L., Feng, H., Yan, X., Song, S., Shao, C., Xiao, X., Yao, E., & Rong, C.2019,Comprehensive Report on Transportation Development in Beijing (2019),Economic Science Press.
2. Rong, C.,2017,Economic Spatio-temporal Analysis| Basic Framework and Its Application,Economic Science Press.
Expert Proposals
1.Xiao, X., Rong, C., Lin, X., Chen, J., & Dai, Q..(2020)The influence of COVID-19 epidemic situation on railway industry and its countermeasures, . 1.Rong, C., & Li, H..(2019)Vigorously promote the TOD development of Beijing rail transit and use the relevant experience for References, . 1.Rong, C..(2019)Promoting TOD development of Beijing rail transit with volume ratio reward, . 1.Rong, C., & Luo, J..(2019)Enlightenment from the transformation of Japanese Railway to the commuter service in Tokyo metropolitan area, . 1.Rong, C..(2019)The responsibility and responsibility of expenditure must be clearly defined in the sustainable development of railway, . 1.Rong, C..(2019)Getting rid of industry monopoly is the core problem that must be solved in railway reform, . 1.Rong, C., Wu, J., & Wang, C..(2018)Suggestions on speeding up independent construction of Beijing suburban railway system, Get instructions from leading roles of leaders at the provincial and ministerial level. 1.Rong, C..(2018)Promoting Beijings reduction-intensive development with rail transit TOD, . 1.Rong, C., & Feng, H..(2017)Constructing commuter railway in southwest Beijing promoting coordinated development of Beijing-Tianjin-Hebei region, . 1.Rong, C., & Feng, H..(2017)Suggestions on planning construction of commuter railway in southwest suburb of Beijing, Get instructions from leading roles of leaders at the provincial and ministerial level. 1.Rong, C., & Feng, H..(2016)Promoting railway freight yard transformation as soon as possible to boost freight transport in large cities, . 1.Rong, C., & Feng, H..(2015)Cross-domain commuter railways are key to coordinated development of Beijing-Tianjin-Hebei Province, . 1.Rong, C., & Feng, H..(2015)Suggestion on speeding up trans-regional commuter rail construction in Beijing-Tianjin-Hebei Province, Get instructions from assisting roles of leaders at the national level.1. Rong, C.. A thought on railway administrative power and expenditure responsibility. 2019 Annual Conference on Economic Committee of China Railway Society. Beijing. 2019-11..
2. Rong, C.. The enlightenment of Japan national railway transformation serving the commuting of Tokyo metropolis area. TSTE 2019. Beijing. 2019-10..
3. Rong, C.. The spatio-temporal economic analysis of the relationship between things and information and shared travel. TSTE 2018. Beijing. 2018-10..
4. Rong, C.. High-speed rail: The relationship between efficiency and equity. TSTE 2017. Beijing. 2017-10..
5. Rong, C.. The problems in basic public services and the traffic right. The 48th Meeting of the Transportation 71 Forum. Beijing. 2017-09..
6. Rong, C.. A reflection on supply-side structual reform of transportation industry. TSTE 2016. Chongqing. 2016-11..
7. Rong, C.. The spatio-temporal economic analysis of the Belt and Road. TSTE 2015. Beijing. 2015-10..
1. Rong, C.. A thought on railway administrative power and expenditure responsibility. 2019 Annual Conference on Economic Committee of China Railway Society. Beijing. 2019-11..
2. Rong, C.. The enlightenment of Japan national railway transformation serving the commuting of Tokyo metropolis area. TSTE 2019. Beijing. 2019-10..
3. Rong, C.. The spatio-temporal economic analysis of the relationship between things and information and shared travel. TSTE 2018. Beijing. 2018-10..
4. Rong, C.. High-speed rail: The relationship between efficiency and equity. TSTE 2017. Beijing. 2017-10..
5. Rong, C.. The problems in basic public services and the traffic right. The 48th Meeting of the Transportation 71 Forum. Beijing. 2017-09..
6. Rong, C.. A reflection on supply-side structual reform of transportation industry. TSTE 2016. Chongqing. 2016-11..
7. Rong, C.. The spatio-temporal economic analysis of the Belt and Road. TSTE 2015. Beijing. 2015-10..
1. Rong, C.. A thought on railway administrative power and expenditure responsibility. 2019 Annual Conference on Economic Committee of China Railway Society. Beijing. 2019-11. .
2. Rong, C.. The enlightenment of Japan national railway transformation serving the commuting of Tokyo metropolis area. TSTE 2019. Beijing. 2019-10. .
3. Rong, C.. The spatio-temporal economic analysis of the relationship between things and information and shared travel. TSTE 2018. Beijing. 2018-10. .
4. Rong, C.. High-speed rail: The relationship between efficiency and equity. TSTE 2017. Beijing. 2017-10. .
5. Rong, C.. The problems in basic public services and the traffic right. The 48th Meeting of the Transportation 71 Forum. Beijing. 2017-09. .
6. Rong, C.. A reflection on supply-side structual reform of transportation industry. TSTE 2016. Chongqing. 2016-11. .
7. Rong, C.. The spatio-temporal economic analysis of the Belt and Road. TSTE 2015. Beijing. 2015-10. .